Prototype for review. All figures are test data, not field results.
Enhanced Oil Recovery · Field pilot · Kuwait

nanoActiv® Lifts Oil Rate in 90‑Day Kuwait Pilot

One producing well was treated with nanoActiv® N₂ Huff‑n‑Puff in June 2026, then measured every day for 90 days against its own baseline.

Well status: producing. 90‑day monitoring complete.

Oil Rate Before and After Treatment

Daily oil rate in barrels per day. The shaded area is oil produced above the decline expected without treatment.

Baseline is the mean of 30 daily readings, 6 May to 4 June 2026. Forecast is an exponential decline from that baseline.

Well Parameters

Fluid, reservoir and surface settings recorded for the pilot well.

Treatment Applied

Three stages over three days, followed by a seven-day soak.

StageProduct and doseDate (2026)
1ST‑Ov4, 7 gal per 1,00023 Jun
2HRT‑SA1, 3 gal per 1,00024 Jun
3Nitrogen stage25 Jun
SoakWell shut in26 Jun – 2 Jul

How the Pilot Ran

1Baseline30 days of daily rates and pressures before treatment.6 May – 4 Jun
2TreatmentThree-stage nanoActiv® application with nitrogen.23 – 25 Jun
3SoakWell shut in for seven days.26 Jun – 2 Jul
4Monitoring90 days of daily production readings.10 Jul – 7 Oct
5ScorecardResults assessed against the pilot targets.8 Oct
Trial map

nanoActiv® Field Trials in Kuwait

Scroll or pinch to zoom, drag to move, and select the well marker to see its record.

The shaded circle marks the general area of the pilot. It is not the exact well location.

Five-Well Pilot Programme

One well has been treated so far. The other four are proposed and have not started, so they are not shown on the map.

WellStatusDetail
Pilot Well 1CompleteTreated June 2026. 90 days of monitoring finished 7 October 2026.
Pilot Well 2Not startedProposed. Depends on approval to extend the programme.
Pilot Well 3Not startedProposed. Depends on approval to extend the programme.
Pilot Well 4Not startedProposed. Depends on approval to extend the programme.
Pilot Well 5Not startedProposed. Depends on approval to extend the programme.
Pre and post scorecard

Before and After Treatment

The 30-day average before treatment compared with the 90-day average after it, against the targets set for the pilot.

KPI Comparison

Production trends

How Production Responded

Water cut, incremental oil and the behaviour of the well in the weeks after treatment.

Water Cut

Incremental Oil

Production Trend Detail

Success criteria

Scoring Against Five Criteria

The pilot is classified by how many of the five agreed criteria it meets.

Criteria Scorecard

Overall classification

Strong Success

Performance Levels

Strong success
Fluid up 10–20%, water cut stable, clear incremental oil
Moderate success
Fluid up 5–8%, water cut controlled, positive incremental oil
Limited success
Increases, but limited improvement in oil fraction
Not successful
Temporary response only, returns to baseline
Monitoring tracker

Phase-by-Phase Log

Every phase of the pilot, how often it was measured, and what was recorded.

Monitoring Log

PhasePeriod (2026)FrequencyNotesStatus

Observations During Monitoring

DayDateOil rate, BOPDObservation
Engineering analysis · Operator view

Decline, Gas-Oil Ratio and Pressure

Technical detail for the operator and IIP engineers. This page can be left out of a public version.

Rate Against Forecast Decline

Gas-Oil Ratio

Wellhead and Flowline Pressure

Final recommendation · 8 October 2026

Scale Up Recommended

Decision Options

Scale upCurrent recommendation. Proceed to the remaining four pilot wells.
Repeat pilotNot required.
Modify treatmentNot required.
DiscontinueNot applicable.

Comments

  • Production data shows a strong and sustained response, consistent with nanoActiv® benchmarks.
  • The full 90 days of monitoring were completed before this recommendation was issued.
  • Water rate and the pace of decline should be tracked in the next wells.

Notes on the Data

  • Production and cost data are provided by the operator.
  • Readings were reviewed weekly in the early phase, then monthly.
  • Final classification rests on technical and economic performance. The economic evaluation is held by IIP and is not shown here.