nanoActiv® Lifts Oil Rate in 90‑Day Kuwait Pilot
One producing well was treated with nanoActiv® N₂ Huff‑n‑Puff in June 2026, then measured every day for 90 days against its own baseline.
Oil Rate Before and After Treatment
Daily oil rate in barrels per day. The shaded area is oil produced above the decline expected without treatment.
Baseline is the mean of 30 daily readings, 6 May to 4 June 2026. Forecast is an exponential decline from that baseline.
Well Parameters
Fluid, reservoir and surface settings recorded for the pilot well.
Treatment Applied
Three stages over three days, followed by a seven-day soak.
| Stage | Product and dose | Date (2026) |
|---|---|---|
| 1 | ST‑Ov4, 7 gal per 1,000 | 23 Jun |
| 2 | HRT‑SA1, 3 gal per 1,000 | 24 Jun |
| 3 | Nitrogen stage | 25 Jun |
| Soak | Well shut in | 26 Jun – 2 Jul |
How the Pilot Ran
nanoActiv® Field Trials in Kuwait
Scroll or pinch to zoom, drag to move, and select the well marker to see its record.
The shaded circle marks the general area of the pilot. It is not the exact well location.
Five-Well Pilot Programme
One well has been treated so far. The other four are proposed and have not started, so they are not shown on the map.
| Well | Status | Detail |
|---|---|---|
| Pilot Well 1 | Complete | Treated June 2026. 90 days of monitoring finished 7 October 2026. |
| Pilot Well 2 | Not started | Proposed. Depends on approval to extend the programme. |
| Pilot Well 3 | Not started | Proposed. Depends on approval to extend the programme. |
| Pilot Well 4 | Not started | Proposed. Depends on approval to extend the programme. |
| Pilot Well 5 | Not started | Proposed. Depends on approval to extend the programme. |
Before and After Treatment
The 30-day average before treatment compared with the 90-day average after it, against the targets set for the pilot.
KPI Comparison
How Production Responded
Water cut, incremental oil and the behaviour of the well in the weeks after treatment.
Water Cut
Incremental Oil
Production Trend Detail
Scoring Against Five Criteria
The pilot is classified by how many of the five agreed criteria it meets.
Criteria Scorecard
Strong Success
Performance Levels
- Strong success
- Fluid up 10–20%, water cut stable, clear incremental oil
- Moderate success
- Fluid up 5–8%, water cut controlled, positive incremental oil
- Limited success
- Increases, but limited improvement in oil fraction
- Not successful
- Temporary response only, returns to baseline
Phase-by-Phase Log
Every phase of the pilot, how often it was measured, and what was recorded.
Monitoring Log
| Phase | Period (2026) | Frequency | Notes | Status |
|---|
Observations During Monitoring
| Day | Date | Oil rate, BOPD | Observation |
|---|
Decline, Gas-Oil Ratio and Pressure
Technical detail for the operator and IIP engineers. This page can be left out of a public version.
Rate Against Forecast Decline
Gas-Oil Ratio
Wellhead and Flowline Pressure
Scale Up Recommended
Decision Options
Comments
- Production data shows a strong and sustained response, consistent with nanoActiv® benchmarks.
- The full 90 days of monitoring were completed before this recommendation was issued.
- Water rate and the pace of decline should be tracked in the next wells.
Notes on the Data
- Production and cost data are provided by the operator.
- Readings were reviewed weekly in the early phase, then monthly.
- Final classification rests on technical and economic performance. The economic evaluation is held by IIP and is not shown here.